The Director of Public Works may deny any application for an onsite wastewater system construction permit if the following information is not submitted in full:

A. A completed site plan;

B. A completed percolation data sheet;

C. Soil observation pit or soil boring information as required by the Director;

D. The method used to determine ground water table;

E. An “as constructed” drawing once completed; and

F. All other pertinent information as required by the Director of Public Works..

(Ord. 5794, 2012)