The Director may require that a field evaluation be done on the proposed site. A field evaluation, if required, shall consist of verifying the items described in items A. through C. below:

A. Identifying lot lines, lot improvements, required setbacks, and easements;

B. Viewing soil observation pits and percolation holes; and

C. Verifying all other pertinent information related to the approval process for an onsite wastewater system construction permit.

(Ord. 5794, 2012)